Construction period:
2009 – 2011
The longest continuous bridge without additional supports:
75,9 m
New rail tracks:
8 km
Project implementation by:

During the project time frame of two years the longest continuous bridge without additional supports in Latvia was built – 75.9 m, as well as various new transport and infrastructure objects: a tunnel under a railway, a new street, a passover and two roundabouts. Several sections of adjoining streets were reconstructed. The project also included construction of 8 km of railroad, which was used for railway traffic during the construction of the traffic junction.

 